Pakmaya scheduling project was implemented live.
With the project, a joint planning structure was started at the packaging level at the production sites in three different campuses.
With the project:
· A joint planning structure was introduced at the packaging level at the production sites in three different campuses.
· During the packaging phase, customer-specific constraints were added to ensure a more realistic sequencing of productions.
· Changes and improvements were made in the existing MRP structure regarding both master data and processes.
· Considering customer deadlines, more effective deadlines were provided.
· More realistic and easier deadlines can be tracked on the system.
· By integrating with the portal, where group-specific applications are used, data is obtained from the source.
· During the production phase, using hand terminals; Two-way integration was provided for starting production, ending production and inputting production stop information.
· Planning and tracking of domestic and international requests can be made on a single screen.
· Improvements were made in business plans and similar master data.
· Integration with process type production was achieved.